Fengcheng Iron ore, Mining permit to 0.79 km2, Open-pit mining, Reserves of 1400 million tons,
About 10% of the surface oxide ore grade, four veins, the most wide 60 m,Native 25% of the ore
grade, there are two Selections which can process 2700 tons of ore every day, It is on the
edge of the mine in the Capital Iron and Steel mine, belong to a metallogenic belt, Price is
¥160,000,000 Yuan (RMB)